INSTALLATION
Wall drilling and bracket fixing
-
Wall marking:
Draw a vertical line on the supporting wall up to the ceiling, or as high as practical, at the centre
of the area in which the hood will be installed.
Draw a horizontal line at 650 mm above the hob.
Place bracket 7.2.17.2.17.2.17.2.17.2.1 on the wall as shown about 1-2 mm from the ceiling or upper limit aligning
the centre (notch) with the vertical reference line.
Mark the wall at the centres of the holes in the bracket.
Place bracket 7.2.17.2.17.2.17.2.17.2.1 on the wall as shown at X mm below the first bracket (X = height of the upper
chimney section supplied), aligning the centre (notch) with the vertical line.
Mark the wall at the centres of the holes in the bracket.
Mark a reference point as indicated at 116 mm from the vertical reference line and 305 mm
above the horizontal reference line.
Repeat this operation on the other side.
Drill o 8 mm holes at all the centre points marked.
Insert the wall plugs 1111111111 in the holes.
Fix the brackets using the 12a12a12a12a12a screws (4,2 x 44,4) supplied.
Insert the two screws 12a12a112a12a2a (4,2 x 44,4) supplied in the hood body fixing holes, leaving a gap of 5-
6 mm between the wall and the head of the screw.
GB16 |